Log |
Last updated: 20 September 2013 |
K-350 Submersible Build Diary |
Side Thrusters |
Dismantled. |
Side Thrusters |
Removing the Composite Shaft. |
Side Thrusters |
Refitted. |
Side Thrusters |
Almost Complete. |
Battery Pods |
Port Pod Complete. |
Battery Pods |
Starting on Starboard Pod. |
Battery Pods |
Holes Cut. |
Battery Pods |
Filleting the Holes |
Battery Pods |
Pods Complete. |
Through Hulls |
Drilling for Cut. |
Through Hulls |
Cutting. |
Through Hulls |
Vent Nipple Complete. |
Through Hulls |
Preheating for Motor Rotating Through Hull. |
Through Hulls |
Complete. |
Overpressure Valve |
Welded in from one side. |
Battery Trays |
Starting on Battery Trays. |
Battery Trays |
Mounting Brackets. |
Through Hulls |
MBT Vents. |
Through Hulls |
Hand Threading MBT Vents. |
Through Hulls |
MBT Through Hulls Complete. |
Gantry |
Setting up. |
Endcaps |
Bevel. |
Endcaps |
Marking out. |
Endcaps |
Hole Cut for Dome. |
Endcaps |
Grinding to Fit the Domering.. |
Endcaps |
Fitting the Domering. |
Endcaps |
Backgouging. |
Endcaps |
Domering Complete. |
Elec. Through Hulls |
SubConn Bulkhead Connectors. |
Endcaps |
Fittings. |
Submersible Build Log |