Endcaps |
02/05/10 |
The domering is quite heavy so I used the gantry to lower it in and out of the hole. It took me forever to grind it to fit and I really should have cut the hole out a little bigger. I also made a wooden ring to protect the machined surface of the ring as I work on it.
|
< Next |
Previous > |
Submersible Build Log |