VBT |
02/11/08 |
Here I am setting up the other cap to weld to the VBT pipe itself. This is a standard single V weld and I set a 2mm gap up with some washers. Then I tacked the cap, removed the washers and completed the root run all the way round. The last picture shows the inside. The bead should just come through to ensure 100% penetration but not be to much or to lumpy so it might restrict liquid flow. Looks ok to me. |
Submersible Build Log |