Hatch

09/03/08

The 3 remaining reinforcing rings need to go in, but I have had to take the strips to a professional shop for rolling.  The machine I used for the first ones has broken, so I have no other option.  In the meantime, I am making parts for the hinge arrangement.  1.5 x 0.5 inch bar cut and ground to shape.  I have put the curves on using the bench grinder and here the pieces are clamped together to make sure they come out the same shape.

Submersible Build Log