Submersible Build Log

Elec. Through Hulls

05/06/10

Once I had welded in the electrical through hull, I completed the thread by hand.  I did it this way because the through hull pinches slightly with welding, so doing it after eliminated this problem.  Note I had to use a socket and bar as the proper handle seems to have gone missing.  The bottom picture shows the SubConn bulkhead connector temporarily in place.  This is the front endcap complete now.