21/07/13 |
Business Name |
Dome |
Submersible Build Log |
I assembled the dome. I have had an aluminium ring machined up by a local engineering company. Its 20mm thick, beveled to match the dome and has a 2.5mm O ring groove cut into the bottom edge. 24 bolts hold it to the ring. I greased up the 3mm O ring and fitted it all together. Seems ok. |