21/07/13

Business Name

Dome

Submersible Build Log

I assembled the dome.  I have had an aluminium ring machined up by a local engineering company.  Its 20mm thick, beveled to match the dome and has a 2.5mm O ring groove cut into the bottom edge.  24 bolts hold it to the ring.  I greased up the 3mm O ring and fitted it all together.  Seems ok.