15/09/12

Business Name

Plumbing

I fitted up one of the tanks to the system and tested it out.  I wound the dial from outside through a viewport incase something went wrong.  Pumped it to full tank pressure which was as these were filled, 200 bar.  The system is designed for 300.  There was not a single leak, not one.  I was very pleased with that. 

Submersible Build Log